![]() This way, he has only a few inches to run wire straight out of his amp to each binding post. This way, after finding out which side he ran his power wire down, I can figure out which way the amplifier needed to be spun on the back of the box and where my binding posts needed to be. This screenshot is from the Kicker website, where I had to look up the terminal layout of his amplifier. Cured but with a second joint glue application along the entire perimeter of the compression chamber and inside corner of the wave guide. No mechanical fasteners used on this part. Glue applied to wraparound wave guide, about to position, set and clamp. ![]() Pic of assembled and dried baffle and side. Very few staples were used when I had time to apply just pressure and glue, during specific stages of construction.įinished panels except for throat round over and mouth angle. She came out beautiful and I sure hope the packing was sufficient enough for the treacherous hands of UPS.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |